Pages

Sunday, 21 September 2025

Day 35 - Murray Bridge

A fairly quiet day. Watched Church then to a shopping centre for morning tea & Faye a haircut. Walked around part of the waterfront. Most of it was closed & ticketed for an event “The Australian International Pedal Prix”. Today was a 24 hour endurance race - all human powered.

A few murals around…

A quick look around then lunch & food shopping before back to the van.

The road bridge has lots of history. Was built in 1879 & the first bridge over the Murray. Shortly after opening as a road bridge it was also used for rail until a separate rail bridge was built in 1924.

Leaving here in the morning & the plan is for Naracoorte Caves.

No comments:

Post a Comment